Material record
Supplier, grade, data sheets and the material batch used in each production batch.
How we work · Quality
Quality in contract moulding isn't a certificate on the wall. It's a documented material, first parts from each tool measured against the drawing, a material declaration with every order, and a rule that nothing changes without your agreement.
Our approach

Our programmes are built on agreed records: the material we agreed, first parts from each tool measured against the drawing, batch traceability, available on request, and the tool history that tells us how the tool has been treated.
And one rule: nothing on that list changes without your written agreement. Not the grade, not the supplier, not the colour recipe, not the process. That discipline is what makes batch forty look like batch one.
We don't hold ISO 9001 or any similar certification. We work to written procedures under a single quality system, and we'll tell you plainly what documents we can provide. If your supplier approval process needs specific documentation, ask and we'll tell you plainly what we hold and what we can provide.
What we record
Supplier, grade, data sheets and the material batch used in each production batch.
First parts from each tool measured against the drawing. Any further checks, such as hardness, colour or feel, are agreed on your quotation.
Available on request: material batch, colour recipe, cure conditions, tool ID and run date, in the format your quality system expects.
Maintenance, repairs and refurbishment logged against each tool. See tool refurbishment.
How parts are checked
We'd rather agree a measurement method with you once than argue about measurements every month.
Critical features, cosmetic zones and functional checks written down before the tool is cut.
Instrument, fixture and part condition. See our tolerances guide.
Physical samples showing acceptable and unacceptable, for the things a drawing can't describe.
First parts from each tool measured against the drawing; any further checks agreed on your quotation on multi-cavity tools.
Results trended so drift is caught and corrected before it becomes a reject.


Change control
If a material supplier changes a grade or discontinues it, you hear from us as soon as we hear.
Any alternative is proposed with data and samples. You decide whether to accept it.
After an accepted change, first parts are measured against the drawing again, as if the part were new.
The change, the reason and your approval are kept with the programme records.
Related
Deflash, trim, print, bond, assemble, inspect and pack. Everything that has to happen between the press opening and the part being ready for your…
Open the serviceSilicone moulding for medical device makers using medical-grade materials to a documented specification, with batch traceability from drum to…
Open the serviceFor parts that will be in production for years — components inside a device family, sealing parts on long-lived equipment, consumer parts on a…
Open the serviceGet in touch
Rough annual volume, target unit price, and any deadlines. That's enough to work out whether compression, LSR injection or something else is the right tool.
Real people, a real workshop
No call centre and no middlemen. When you contact TCI Products, you speak to the team who design, build and check your mould.



Thomas LaneManaging Director
George PrestonDesign & Project Manager
Kelly BallingerHead of Partnerships
Jim AndertonProduction Manager
TheodoreEmployee Welfare